A big thank you to the 2014 Falcon Lodge Resort Committee for many hours of hard work getting the grounds cleaned up, and many large projects completed in addition to preparing and cleaning their assigned cabins for the rental season.
Highlights of some projects completed this year:
-
Washrooms: New ceiling installed, new hand towel and soap dispensers installed; both washrooms prepped and painted including stalls, new toilet paper holders, new flooring in the showers.
-
New outside shower platform and shower head installed to assist younger kids with showering off after swimming.
-
Three new lights installed for security (and an on/off switch installed on the light by the fire pit at the lake in response to renters comments on the survey this year!).
-
Additional axles were installed on the dock which makes it much easier for the committee to put in and take out of the lake.
-
Removal of rotten basement floor in the lodge.
-
A new games room was built in the Lodge which is now home to the shuffleboard and club memorabilia which were once was part of our clubrooms on Manitoba and Parr. (Special thank you to Kent Cielen for putting up all the pictures & trophies in the new games room)
- A new CPAC sign was put up by the highway as well as a new Falcon Lodge Resort sign at the gate.
Additionally we would like to extend our thanks to the following members who helped the committee with raking and cleaning up the grounds:
-
Gloria and Bob Beleyowski
-
Tamara Harrison and Stephen
-
Linda Taylor
During the fall, an additional hot water tank has been installed as well and new water lines above the drop ceiling in the washroom to prevent pipes from freezing and bursting in the future.
Spring 2015 projects include:
-
Wood Shed to be torn down
-
Paint outside of Cabin 8
-
Redo floors in washroom
-
Grind all tree stumps on property
-
Split wood for season
Fall 2015 projects include:
-
Pour footings for new garage
-
Roof repair on original garage